Direct answer: assemble facts before drawing the extra room

A villa-extension feasibility pack should combine a clear household brief with verified information about the existing building, plot, levels, structure, services, external space and likely approval pathway. It should also define the options to compare, the unresolved risks, a provisional budget boundary and the evidence needed before concept design advances. This prevents an attractive plan from becoming the starting point for avoidable redesign. RIBA’s Plan of Work places client requirements, site appraisal, feasibility, project risks, site information, budget and programme before or alongside the project brief; that is a useful order for a homeowner even when the project is smaller.

Record the existing villa and plot as one system

An extension is not an isolated box. The pack should identify floor and threshold levels, key dimensions, roof and drainage relationships, visible structural clues, utility and plant locations, glazing, landscaping and access for construction. Existing drawings are helpful but should be checked against measured conditions. Where structural capacity, buried services, waterproofing or authority records are uncertain, state the limitation and commission the appropriate qualified review. Do not hide missing information beneath a concept drawing. A labelled survey photograph or drawing reference is far more useful than a general note saying “to be confirmed.”

Turn household wishes into testable requirements

“More space” is not a sufficient brief. State the activity, number of users, privacy, furniture, storage, daylight, connection to the garden and relationship to existing rooms. Decide what must improve even if no area is added. An internal reconfiguration can sometimes remove a circulation bottleneck or combine underused rooms with less disruption than an extension. The feasibility pack should therefore include a no-extension baseline. Comparing each option against the same outcomes keeps floor area from becoming the only measure of success.

  • Activities and users the new space must support
  • Furniture, storage and equipment assumptions
  • Preferred links to kitchen, living rooms and garden
  • Privacy, shade and daylight priorities
  • Rooms or features that must remain unchanged
  • Whether the home will be occupied during work

Identify the approval questions without guessing the answer

Dubai has a common building code, but the reviewing authority, plot controls, developer or community requirements and required consultant submissions can vary. The feasibility pack should record the property identifiers available to the owner, existing approvals or drawings, and the proposed type of change. A qualified consultant can then confirm the current route with the relevant bodies. Dubai Municipality publishes building-permit procedures and the Dubai Building Code; other zones may use their own authority services. The correct conclusion at feasibility stage is often a list of verified questions and submission responsibilities, not an unsupported promise that an extension will be approved.

Planning example

Imagine a fictional family considering a rear extension for dining and homework. Option A adds a single large room; Option B enlarges the opening between the existing kitchen and dining area and adds a smaller shaded bay. The survey shows a level change to the garden, an existing drainage run near the preferred wall and limited side access. The feasibility pack does not select a structural solution. It records the drainage investigation, level strategy, construction access and qualified structural review as prerequisites. The comparison then scores both options against daily use, retained garden, disruption, service changes and approval uncertainty. A smaller addition may be the better response if it achieves the brief with fewer interfaces.

Compare options on more than construction area

For each option, note changes to structure, envelope, glazing, cooling, electrical supply, drainage, waterproofing, finishes and landscaping. Add delivery and access constraints, temporary protection and whether existing rooms remain usable. Cost planning should use the same assumptions across options and should distinguish known scope from allowances. A larger extension may not be the most expensive option if a smaller proposal has complex structural or service diversions; conversely, a simple-looking room can become difficult where thresholds, roof junctions and drainage are unresolved.

Feasibility-pack checklist

Before concept design is treated as a preferred scheme, the pack should be reviewed as a coordinated set. Technical investigations must be carried out by competent professionals; this checklist is for commissioning and decision-making, not construction instruction.

  • Measured plans, elevations, levels and survey limitations
  • Relevant existing approvals, records and property identifiers
  • Household outcomes and a no-extension baseline
  • Known structural, service, drainage and envelope interfaces
  • Access, occupation and protection constraints
  • Authority, developer and community questions with named owners
  • Comparable option assumptions, risks and budget boundary
  • Decision gates for further survey, concept approval and developed design

Set the decision gate for concept design

The feasibility stage should end with an explicit gate, not a gradual slide into detailed design. At that gate, the owner should be able to see which outcomes each option satisfies, which site facts have been verified, which authority questions remain open, and how the main cost and disruption drivers differ. The team should also state what will be investigated in the next stage and what would cause the preferred option to change. If a key level, structural assumption, service route or plot constraint is still unknown, approve only the next investigation rather than the physical proposal. This keeps design effort proportional to confidence and creates a clear record of why one route advanced.

Limitations and the next step

A feasibility pack narrows uncertainty; it cannot replace formal surveys, engineering design, specialist calculations or approval. Conditions concealed within the villa may still emerge later, and authority requirements can change. The next step is to appoint the relevant qualified professionals to verify the recorded constraints, confirm the approval route and prepare two or three genuinely different options against the same brief. Approve a concept only when its dependencies, exclusions and next investigations are visible, recorded and assigned.

Sources & further reading

Make this useful for your project.

A review of your property and priorities can turn general guidance into a defined brief.

Explore Villa extensionsDiscuss your project
Return to the journal