Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
Aureva / Materials & makers

Chosen with intention.

A starting point for your specification conversation. Explore materials and established product makers, then select against your project’s actual requirements.

The light-filled family room — design concept
Kitchen appliances

Miele

Explore the maker’s current collections and technical information. We review the selected model, dimensions, finish and installation requirements as part of the project specification.

Visit the official collection
Bathroom collections

Duravit

Explore the maker’s current collections and technical information. We review the selected model, dimensions, finish and installation requirements as part of the project specification.

Visit the official collection
Architectural surfaces

Cosentino

Explore the maker’s current collections and technical information. We review the selected model, dimensions, finish and installation requirements as part of the project specification.

Visit the official collection

Brand names identify products for consideration. They do not imply an authorised dealership, endorsement or partnership. Availability, supply, installation and manufacturer warranty terms are confirmed for the selected products.

From inspiration
to specification.

Review samples in the setting where they will be used. Consider cleaning, maintenance, exposure and the details where materials meet. Final product information should be coordinated with the drawings before purchasing or fabrication.

Discuss your material brief
THE SPECIFICATION NOTEBOOK

Choose with the whole life of the material in mind.

Compare the use, installation and care of each selected product. Samples establish a direction; the final schedule should identify the exact references, locations, quantities and responsible suppliers.

Villa material concept showing a limestone threshold and sliding doors opening to a courtyard.
Original design concept

Large-format porcelain

Where it contributes
A consistent finish across suitable interior or exterior areas.
Before approval
Confirm the chosen product's intended use, slip characteristics, substrate and movement-joint details.
After installation
Use the selected supplier's cleaning instructions and retain spare tiles.

Timber and veneer joinery

Where it contributes
Warm storage, wall panels and furniture-like architectural details.
Before approval
Review moisture exposure, grain matching, edge treatment and hardware before approving samples.
After installation
Keep finishes away from standing water and use product-specific cleaning guidance.

Glazing systems

Where it contributes
Daylight, garden views and a more useful connection between rooms and terraces.
Before approval
Compare the complete system: glass, frame, seals, openings, installation and maintenance access.
After installation
Keep drainage paths clear and record the frame, glass and hardware specifications.

Further product and planning research

Use current information from the relevant manufacturer or authority for the actual scope. These references do not imply a supplier partnership or endorsement.

YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your villa renovation brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry