Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
Aureva / Cost guidance

A useful budget begins with a clear scope.

Understand what shapes the cost of villa renovation before comparing proposals. Every final quotation follows the property, measured scope and agreed specification.

01 / SCOPE APPROACH

Focused upgrade

Target a defined part of the property while retaining suitable existing elements.

Typical focus
A specific room, finish or system
What to resolve
Condition of retained work and installation interfaces
Discuss your scope
02 / SCOPE APPROACH

Complete transformation

Coordinate a full room, property or commercial space as a connected project.

Typical focus
Design, removal, specialist works and finishes
What to resolve
Complete specifications and a clear work sequence
Discuss your scope
03 / SCOPE APPROACH

Bespoke project

Develop a tailored design with custom details and specialist coordination.

Typical focus
Original design, fabrication and carefully selected materials
What to resolve
Design development, prototypes or samples and procurement
Discuss your scope
THE COST DRIVERS

Look beyond
the area rate.

A square-metre or square-foot rate is only useful when it identifies the measured area, specification and inclusions. It cannot replace a review of your actual property.

01

Rooms, area and existing condition

02

Layout and building-service changes

03

Kitchens, bathrooms and bespoke joinery

04

Glazing, envelope and outdoor interfaces

What your proposal
should make clear.

Request a scoped review
  • Measured scope and specification
  • Included supply and installation responsibilities
  • Allowances, exclusions and unresolved conditions
  • Design, approval and procurement responsibilities
  • Programme, payment milestones and change process
  • Handover information and warranty responsibilities

We do not publish a generic starting price as a substitute for a project scope. Share your working budget and priorities so the proposal can be developed around useful choices.

BUILD A COMPARABLE SCOPE

Make the assumptions visible.

Price the same work before comparing totals. The following information helps connect your Aureva brief to an itemised proposal.

Information that supports the quotation

  • Existing villa drawings if available
  • Spaces to retain and reconfigure
  • Photos of cracks, damp or recurring defects
  • Occupation and temporary-living requirements
  • Garden and pool interfaces
  • Desired finish level and decision makers

Questions for the commercial review

  • Which design, supply and installation tasks are included?
  • Which quantities and products are confirmed, and which remain allowances?
  • Who provides retained-condition investigations or specialist reviews?
  • What protection, delivery, removal and making-good work is included?
  • How are changes priced and approved before proceeding?
  • What documents and completion criteria support the payment stages?

Large-format porcelain

Confirm the chosen product's intended use, slip characteristics, substrate and movement-joint details.

Include the ongoing requirement: Use the selected supplier's cleaning instructions and retain spare tiles.

Timber and veneer joinery

Review moisture exposure, grain matching, edge treatment and hardware before approving samples.

Include the ongoing requirement: Keep finishes away from standing water and use product-specific cleaning guidance.

Glazing systems

Compare the complete system: glass, frame, seals, openings, installation and maintenance access.

Include the ongoing requirement: Keep drainage paths clear and record the frame, glass and hardware specifications.

Website concepts and general guidance are not quotations. Scope, product choices, applicable charges and commercial terms belong in the written proposal.

YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your villa renovation brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry